Public Flagship Report · v2.2

Portfolio result1 bounded Scale, 3 time-boxed Repair, 2 Kill

For whomLeaders responsible for AI budgets, workflows, technology delivery, or risk

How to use itReplace the fictional portfolio with local baselines, comparators, and cost records

Full web report · Free PDFSources through 2026-07-14

Download English PDF

What management needs to decide

The report’s central judgment is that many companies should examine one portfolio risk in 2026: pilots may be growing faster than comparable evidence and shared delivery capacity. When that mismatch appears, weak-evidence projects may continue to absorb integration, review, and change resources while stronger-evidence projects wait.

In the wholly fictional 6-project portfolio below, 1 project qualifies for bounded Scale, 3 can enter only time-boxed Repair, and 2 should lose their current priority claim on scarce resources. The distribution illustrates the decision criteria only; it is not a result from a real company, an industry benchmark, or a project recommendation.

6 fictional pilots: illustrative decisions

P1–P6 are illustrative identifiers. All evidence states, constraints, and decisions are fictional.

PilotPublic outcomePrincipal basisNext boundary
P1 Customer-response draftingTime-boxed RepairOnly a response-time change is observed. There is no credible comparator, and reopens, senior review, and incorrect advice are not fully recordedDo not expand the current scope; add comparator and quality-burden evidence, and remove current priority if the named gap remains open at the deadline
P2 Pre-meeting sales researchTime-boxed RepairOnly self-reported time savings; CRM write remains unapprovedKeep read-only, confirm whether the business accepts the outcome, and do not expand system permissions
P3 Invoice-anomaly pre-checkTime-boxed RepairCompared evidence exists, but false-negative severity remains unresolvedKeep as a read-only pre-check; grant no payment authority until false-negative risk is tested and controlled
P4 Internal knowledge retrievalBounded ScaleComparable results repeat across at least 2 review windows; the named owner, read-only permission filter, and operating burden remain stableScale only over the filtered SOP corpus; continue monitoring source freshness, permission filtering, and exceptions
P5 Contract issue spottingKill — remove current priority claimEvidence is only observed; missed issues have asymmetric impact and legal review is the current bottleneckRelease the current claim on scale capacity; retain testing and issue-taxonomy assets for reassessment if risk or review capacity changes
P6 Code-change agentKill — remove current priority claimChange proposals increased, but production writes, rollback, and permission boundaries remain hard blockersDo not expand into production; resubmit only after the control gaps close and new evidence exists
016 fictional pilots
02Bounded Scale: P4
03Time-boxed Repair: P1 / P2 / P3
04Remove current priority: P5 / P6

Figure 1 | Illustrative decisions for the fictional portfolio. Kill removes priority within the current portfolio cycle. It is not a permanent prohibition or a judgment against AI or the project team as a whole.

Management implications and principal risks

  • Scale requires stable outcome evidence, operating burden, and controls; use or a single demonstration is not sufficient.
  • Repair needs a named gap, owner, deadline, and default exit. Without them, it becomes indefinite continuation.
  • System writes, permissions, rollback, and high-impact false negatives are hard constraints that potential benefit cannot offset.
  • Portfolio decisions need to include integration, review, rework, exception, and maintenance costs carried by shared teams.
  • When current priority is removed, retain comparator designs, issue taxonomies, and control records for reassessment if conditions change.

Why portfolio decisions matter more in 2026

The BCG 2026 executive survey covered 2,360 executives and found that respondents expected AI spending to rise from about 0.8% of revenue in 2025 to about 1.7% in 2026. Of those surveyed, 94% said their organisation would continue investing even if it generated no return in 2026. The survey measures plans, confidence, and pressure, not audited ROI. It cannot prove that stopping has become harder, but it suggests that stop, reduce, or defer decisions may face greater organisational and reputational resistance among the surveyed organisations.

At the same time, a McKinsey 2025 survey of 1,993 respondents found that 88% said their organisation regularly used AI in at least one function, while nearly two-thirds had not reached enterprise-wide scale; 39% reported any enterprise-level EBIT impact. An IBM 2025 survey of 2,000 CEOs used another denominator: respondents believed only 25% of AI initiatives had delivered expected ROI, 16% had scaled enterprise-wide, and 50% acknowledged that rapid investment had created disconnected technology.

These figures cannot be averaged because their samples, questions, and denominators differ. They support a limited but important management conclusion: willingness to keep investing may be stronger than the maturity of attributable results. Management therefore needs consistent continuation criteria across projects instead of allowing each pilot to define success on its own.

Apparently conflicting figures measure different things

SourceSample or methodWhat it measuresWhat it can supportWhat it cannot support
U.S. Census 2026Nationally representative BTOS AI supplementWhether companies use AI in business functionsUse remains shallow within an official business frameProject ROI or management quality
NBER Firm Data on AINearly 6,000 senior executives across four countriesCompany use, past impact, and future expectationsBroad use can coexist with limited realised impactA global corporate failure rate
McKinsey 20251,993 online survey respondentsOrganisational use, scale, and EBIT impactScaling and impact are uneven among surveyed organisationsA nationally representative adoption rate
IBM CEO Study 20252,000 CEOsWhether initiatives met expected ROIA CEO-perceived value-conversion gapAudited, standardised ROI
Microsoft / NBER / METRField experiments or task studiesProductivity in specific tasksSome settings record measurable local effects, with heterogeneous resultsWhole-enterprise profit

A U.S. Census 2026 working paper estimated that about 18% of companies used AI in at least one function between 2025/11 and 2026/1. Among functional adopters, 57% covered only three or fewer functions; among companies reporting worker-task use, about 65% covered only three or fewer worker tasks. The survey question changed in 2025/11, so the results should not be spliced directly into the earlier series.

NBER’s 2026 Firm Data on AI is based on nearly 6,000 senior executives in the United States, United Kingdom, Germany, and Australia. Of the surveyed companies, 69% said they were actively using AI; more than 90% reported no observed employment impact over the past three years, 89% reported no observed productivity impact, and more than 80% reported neither. These findings come from executive self-reports and a four-country sample. They cannot prove that companies achieved no local benefits, but they remind management to distinguish “in use” from “changed enterprise results”.

For that reason, this report does not create a single adoption or success chart. Plotting different denominators on one trend line would imply a stronger conclusion than the underlying studies support.

Local productivity changes can be measured, but they are not enterprise value

Task research shows that local benefits can be measured in some settings. An NBER staggered-rollout study of 5,179 customer-support agents found that generative AI increased issues resolved per hour by an average of 14%, with gains concentrated among less experienced and lower-skilled workers. Microsoft Research combined three field experiments involving 4,867 developers and reported an increase of about 26% in completed tasks, with a standard error of 10.3 percentage points. These studies support the claim that AI can produce measurable improvements in some structured work.

But effects do not point in the same direction across all tasks. A METR 2025 study of 16 experienced developers familiar with large open-source codebases and 246 real tasks found that early-2025 AI tools increased completion time by an average of 19%, although participants later believed they had worked 20% faster. This result can only serve as a historical counterexample: METR has explicitly marked the 2025 result as outdated and not representative of current tool effects, while its 2026 follow-up did not provide a reliable replacement estimate for current effects.

Management should therefore avoid extracting a single average productivity figure from these studies. A more useful approach separates three layers of effect:

  • Task effect: whether a specific task becomes faster or more accurate.
  • Workflow conversion: whether the local improvement reduces cycle time, error, or waiting across the workflow.
  • Portfolio value: whether the improvement deserves shared integration, review, risk, and change capacity.

A pilot can succeed at the first layer, fail at the second, and still not deserve priority at the third. Portfolio decisions therefore need to retain benefit evidence, shared costs, and opportunity costs at the same time.

Why weak-evidence pilots may survive

The gains and losses facing different participants are asymmetric. An AI product team may benefit from use, feature launches, and sponsor approval. The workflow owner handles edge cases and manual fallback. The CIO carries long-term integration and maintenance. The CISO and legal team may carry low-probability, high-impact incidents. The CFO is then asked to show whether these distributed changes reach the income statement.

When each department selects its own success metric, project comparison can deteriorate into a contest of narratives. Figure 2 summarises the resulting mechanism chain.

The principal-agent problem offers one possible explanation for this cycle. Project sponsors are closer to the pilot and see demonstrations and local data sooner. Shared teams understand the long-term operating burden better, but often enter only after budget approval. Information asymmetry may make evidence gaps difficult to see at the decision interface and may also lead organisations to misread “stop” as “failure”.

011. Models and tools are easy to obtain
022. Departments launch pilots quickly
033. Each sponsor selects a local metric
044. Benefits stay with the department; review and integration costs move to shared teams
055. Sunk costs and reputational pressure keep projects alive
066. Scarce capacity is fragmented
077. Weak projects survive, strong projects wait, and organisational learning slows

Figure 2 | Pilot-survival mechanism chain. This is a mechanism hypothesis, not an allegation about any company or team. Local metrics, shared costs, and sunk costs may jointly change project survival conditions. Its actual strength needs to be tested against a company’s own portfolio history.

Change the unit of comparison: from a tool to a named workflow

Before a pilot can claim scarce delivery capacity, it should submit a one-page contract. The unit of analysis is an end-to-end business workflow with an accepted outcome; the model, seat, and features are only inputs.

In this report, capacity means shared delivery capacity. An accepted outcome is a result accepted by the business that remains valid downstream. A hard gate cannot be offset by a higher score elsewhere. A system write changes the state of a business system, while rollback returns the workflow to a known safe state.

FieldMinimum requirementTreatment when insufficient
WorkflowStart event, end result, and ownerIf it cannot be named, Kill or return it to the idea pool
Accepted outcomeAccepted by the business and still valid downstreamRaw output alone leads to Repair
Baseline / comparatorConcurrent, phased, matched cohort, or stable historical lineSubjective time savings alone cannot support an ROI claim
Measurement windowStart and end dates, task volume, and exception definitionAn open-ended pilot cannot consume integration capacity
Operating burdenManual review, rework, integration, monitoring, change, and fallbackComplete missing fields or retain them as uncertain costs
OwnersBusiness, technical, and risk ownerAny missing owner blocks Scale
Stop ruleError, permission, review, or maintenance boundaryIf not written before testing, do not start

This contract makes differences visible without pretending that every project needs the same threshold. High-frequency, low-risk knowledge retrieval and a low-frequency, high-impact invoice-control agent require different limits, but both must state what outcome counts, what evidence supports it, and who carries the burden.

Three gates: Evidence, Conversion, and Control

Gate A | Comparable evidence

Management first checks whether the project names its workflow, accepted outcome, baseline or comparator, measurement window, exception definition, and three owners. Use, message count, output volume, or demo speed may still have learning value, but they do not justify the same scale budget as outcome evidence.

Gate B | Conversion evidence and burden

This report does not develop an enterprise ROI model, a complete counterfactual design, or weighted prioritisation. At portfolio level, it asks three questions: how strong is the accepted-outcome evidence against a comparator; how much operating burden do the teams carrying the work confirm; and what other work is displaced when the project uses scarce integration and review capacity?

FieldPortfolio-level recordTreatment when unknown
Conversion evidenceUnknown / Observed / Compared / RepeatedCannot enter Scale
Operating burdenUnknown / Low / Medium / High; define local bands using hours/month, integration days, or a cost range, then ask the teams carrying the burden to confirm themAn undefined or unconfirmed band leads to time-boxed Repair
Opportunity costIntegration capacity, security-review slots, validation hours, and delayed projectsExplicit confirmation by the budget owner

Detailed value, cost, and causal attribution require local company data and a separate workflow-measurement package. Without a baseline, an industry average should not be used to fabricate a precise ROI.

Gate C | Control and constraint fit

NIST’s GenAI Profile identifies Governance, Content Provenance, Pre-deployment Testing, and Incident Disclosure as four primary considerations, and its suggested actions discuss continuous monitoring and incident response. The NIST 2026 AI Agent Standards Initiative foregrounds agent reliability, interoperability, security, and identity. Its launch material also points to identity and authorisation work, as well as the access context agents have for external systems and internal data.

This framework therefore includes permissions, traceability, human escalation, rollback, and continuity in the pre-launch check. For pilots involving system writes, customer communication, movement of funds, regulated judgments, or production changes, an unresolved control gap is defined as a hard blocker. This framework judgment does not replace a company’s own legal, security, or compliance review.

011. Gate A: Is the evidence comparable?
022. Gate B: Are conversion evidence, operating burden, and opportunity cost comparable?
033. Gate C: Can permissions, accountability, rollback, and capacity support it?
044. Can the gap be closed within a fixed window?
055. Repair: named gap, owner, deadline, and default exit
066. Kill: no reachable evidence path, no valid capacity claim, or an uncontrollable hard constraint
077. Scale: stable across defined company review windows, then expand within explicit bounds

Figure 3 | Three gates and three survival states. Missing evidence or a hard blocker at any gate may lead to Repair, a return to the idea pool, or a stop. Only projects that pass all three gates should be considered for bounded Scale. The 2 consecutive review windows are a cautious illustration used in this report, not an industry benchmark; each company needs to set its own threshold according to workflow risk and local capacity.

Three survival states: Kill / Repair / Scale

Keep can easily become an open-ended intermediate state. Repair instead requires five items to be written down together: the gap, who will close it, when it will be reviewed, what evidence counts as closure, and whether a missed deadline automatically triggers Kill.

StateApplicable conditionsRequired record
KillNo reachable evidence path; an uncontrollable hard constraint; clearly higher opportunity costReason for termination, learning captured, reusable asset, and conditions for resubmission
RepairValue may still exist and a named evidence or control gap can be closed within a fixed windowOwner, deadline, required evidence, and default exit condition
ScaleConversion evidence, operating burden, and control conditions remain stable across at least two review windows, and the budget owner confirms the opportunity costBounded scope, capacity budget, monitoring, rollback, and next review

In this framework, Kill removes a project’s current priority claim on scarce capacity; it is not a judgment against AI or the team as a whole. If new evidence, lower costs, or improved controls change the conditions, the project may re-enter the idea pool with a new contract.

Portfolio dashboard: separate value evidence from shared capacity

Value and evidence

MetricRecommended definitionCommon misreading
Pilot conversionNumber of projects and time spent moving from idea to test to compared to scaleMore projects mean stronger innovation
Accepted-outcome rateResults accepted by the business and still valid downstream / total resultsOutput volume equals value
Review burdenExpert-review, exception, and rework hours for every 100 resultsHuman-in-the-loop automatically means safe
Evidence depthPortfolio distribution across Unknown, Observed, Compared, and RepeatedA single before-and-after result is causal evidence

Capacity and control

MetricRecommended definitionCommon misreading
Integration congestionDays waiting for integration, shared dependencies, and maintenance queueAn API connection completes integration
Control integrityPermission failures, unsafe actions, rollback success, and incidents by severity / 1,000 runsLow reporting or no incident means mature controls
Overdue unresolved pilot rateShare of pilots that have passed the repair deadline without producing the required evidenceA continuing pilot is a long-term option
Reallocation speedTime from kill decision to capacity reallocationTermination itself has released value

These metrics still require local definitions. Their purpose is to show management portfolio learning and bottlenecks, not to create another composite maturity score.

Metric integrity rules

  1. Freeze the eligible cohort, numerator, denominator, and exclusion rule before testing. Any change needs a retained version and a restarted comparison window.
  2. The workflow owner certifies the accepted outcome; the sponsor cannot self-certify the denominator, cost, or control.
  3. Record excluded cases, shadow work, manual workarounds, and near misses. Missing items are Unknown, not zero.
  4. Give each project a stable pilot ID so renaming cannot erase its repair deadline or incident history.
  5. Report incident severity, reporting completeness, and rollback success together under control integrity.
  6. Pair reallocation speed with the realised outcome after reallocation to avoid rewarding hasty termination.

To prevent the portfolio mechanism from rewarding only easy-to-measure, low-risk projects, reserve a capped validation window for high-uncertainty work. The window expires, cannot bypass production hard gates, and cannot renew automatically.

A reversible 90-day operating cadence

Day 1-10 | Inventory

List every AI pilot, owner, workflow, current permissions, shared dependencies, cumulative spending, available evidence, and next review. If the integration queue is already visibly congested, pause new commitments; low-risk idea discovery can continue.

Day 11-30 | Standardise

Put every project on the same one-page evidence contract. Record use metrics separately from business outcomes, and list missing baselines, review costs, permissions, and rollback as gaps to close.

Day 31-60 | Bounded tests

In companies where shared capacity is genuinely scarce, give priority to evidence-ready or high-learning-value pilots. Use shadow mode, read-only operation, decision support, phased rollout, and recoverable manual processes where appropriate, while recording negative and null results.

Day 61-75 | Stress test

Before finalising a decision, test the provisional conclusion against higher costs, incidents, key-person departure, audit demands, or demand shifts. If a project cannot degrade safely, roll back, or retain clear accountability, move it back to Repair or Kill. The check should cover denominators, incentives, missing owners, and shared-cost transfer, not only model accuracy.

Day 76-90 | Portfolio decision

Make a Kill / Repair / Scale decision for every project. Repair needs a deadline and default exit. Scale needs a bounded scope, capacity budget, monitoring, rollback, and next review. Explicitly reallocate released capacity so it is not consumed invisibly.

What to watch in 2026-2027

The following is a directional watchlist, not a probability forecast.

Watch 1 | From adoption stories to portfolio accountability

  • Directional expectation: If budget and board pressure continue, CEOs, CFOs, COOs, and technology and risk owners are more likely to decide together whether a project should keep receiving investment, enter repair, or stop.
  • Leading indicators: Public cases begin to disclose the workflow owner, validation burden, full operating cost, kill decision, and capacity reallocation.
  • Falsifier: Large enterprises continue to expand only by seats, messages, or pilot count without visible budget, incident, or maintenance consequences.
  • Review dates: 2026-10-15; 2027-01-15.

Watch 2 | Agent identity and authorisation enter the scale gate

  • Directional expectation: As system access expands, identity, least privilege, reconstructible logs, human escalation, and rollback are more likely to become prerequisites in customer and architecture reviews.
  • Leading indicators: The NIST initiative produces implementable standards; procurement, audit, or cyber-insurance requires agent identity and action traces.
  • Falsifier: Most agent deployments remain low-risk and without system writes for an extended period, while related standards do not affect enterprise procurement or launch.
  • Review dates: 2026-10-15; 2027-02-15.

Watch 3 | High-quality Kill decisions become a learning metric

  • Directional expectation: If portfolio congestion rises, mature teams may begin recording kill quality, reusable learning, and reallocation speed.
  • Leading indicators: Transformation dashboards disclose cancelled pilots, repair deadlines, and reused controls, rather than adoption alone.
  • Falsifier: Organisational performance and financing narratives continue to reward project count and expansion in only one direction, with no visible stopping mechanism.
  • Review date: 2027-01-15.

Boundaries between evidence, inference, hypothesis, and recommendation

Fact. The surveys, official firm data, and field experiments cited in this report support the following facts: AI use and spending intentions are rising; enterprise-wide scale and attributable impact are uneven across surveys; and task effects are heterogeneous. The NIST 2026 initiative foregrounds agent reliability, interoperability, security, and identity. Its launch material also points to identity and authorisation work, as well as the access context agents have for external systems and internal data.

Inference. This report infers that portfolio selection and cross-functional accountability may become constraints when multiple pilots compete for shared capacity. The sources support integration, review, data, change, and governance frictions, but cannot prove that these factors are the primary bottleneck in every company.

Hypothesis. Local metrics, cost shifting, sunk costs, and sponsor incentives may increase the survival rate of weak pilots. This mechanism needs to be tested against a company’s own portfolio history, meeting records, and cost ledger.

Recommendation. Use a common evidence contract, three gates, and time-boxed Repair; present management with the decision, evidence level, unresolved risks, bounded scope, next review, and default exit. This is a reversible management experiment, not accounting, legal, compliance, investment, or vendor-specific advice.

Uncertainty. This report has no project-level baseline, cross-pilot comparator, or complete recurring-cost ledger from a specific company. It therefore provides portfolio decision criteria rather than deciding which project any company should scale.

Update and correction policy

  • Source cutoff: 2026-7-14.
  • If a primary source revises its sample, denominator, or conclusion, the affected pages should be checked again.
  • Stronger enterprise-level causal evidence, public negative cases, or agent standards should trigger an evidence update.
  • If subsequent real-world portfolio outcomes conflict with the report’s mechanism, retain the original judgment, record the deviation, and issue a dated review or correction rather than silently rewriting it.
  • This is a free public report, version v2.2 (web edition published 2026-07-16). If substantive evidence changes the conclusion, the original judgment will be retained and the change explained in a dated correction note. Readers should apply the framework with local data and complete their own financial, legal, security, and compliance review.